Jacob Lane Reach C Kinder-Morgan Pipeline Location Confimation

Summary

SCH Number
2013038483
Lead Agency
Central Valley Flood Protection Board
Document Title
Jacob Lane Reach C Kinder-Morgan Pipeline Location Confimation
Document Type
NOE - Notice of Exemption
Received

Document Description
The project is required to determine the depth and location of a Kinder-Morgan petroleum distribution that is no longer in service. The potholing will be performed by excavating 33 trenches using a backhole. An additional 51 explorations will be conducted using a hydorovac mechanism. Spent water and soil will be disposed of offsite. The trenches will be no more than nine feet long, two to three feet wide and at a maximum depth of 10 feet. No trenches will be left open overnight. All excavated soil will be stockpiled adjacent to the trench and backfilled at the end of the day. No woody vegetation will be removed. Some tree roots may need to be cut near the Sheiff's facility during the trenching and will be monitored by the biologist. Erosion protection will be utilized and the area will be reseeded. The project will take place in April.

Contact Information
Mary Ann Hadden
Central Valley Flood Protection Board
3310 El Camino Avenue, LL-40
Sacramento, CA 95821

916 574 1431

Location

Counties
Sacramento

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
S:15304
Reasons for Exemption
Minor alteration to land.