City of Ukiah Recycled Water Project (Lake or Streambed Alteration Agreement No. 1600-2018-0026-R1)

11 Documents in Project

Summary

SCH Number
2013032072
Lead Agency
Ukiah, City of (City of Ukiah)
Document Title
City of Ukiah Recycled Water Project (Lake or Streambed Alteration Agreement No. 1600-2018-0026-R1)
Document Type
NOD - Notice of Determination
Received

Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2018-0026-R1, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Sean White, representing City of Ukiah. Project is limited to six encroachments, related to the establishment of a subsurface pipeline for recycled water. At locations 1, 2, and 4, the pipe will be placed using jack and bore construction. A subsurface steel pipe will be driven from a jacking pit to a receiving pit, with both pits outside of the bed, bank and channel of the creek. The driven pipe will be at least eight feet below the elevation of the bottom of the channel. At locations 3, six meter connections will be trenched across Gibson creek, with bed and banks restored to original condition after disturbance. Connections will be buried at least four feet below channel bottom. At locations 5 and 6, the recycled water pipe will be trenched across unnamed tributaries, with bed and banks restored to original condition after disturbance. The pipe will be at least three feet below the bottom of the channel. No riparian trees will be removed for this project.

Contact Information
Daniel Harrington
CDFW
619 Second St.
Eureka, CA 95501

707-964-7683

Location

Coordinates
39°8'46"N 123°12'36"W
Cities
Ukiah
Counties
Mendocino
Cross Streets
Hwy 101 and Ukiah
Zip
95482
Total Acres
990
Parcel #
Various
State Highways
Hwy 101
Airports
Mendocino County
Waterways
Russian River

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
619 Second St., Eureka, CA 95501

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search