El Dorado Forebay Dam Modification Project

6 Documents in Project

Summary

SCH Number
2013032036
Lead Agency
El Dorado Irrigation District
Document Title
El Dorado Forebay Dam Modification Project
Document Type
NOD - Notice of Determination
Received
Posted
3/24/2014
Present Land Use
Timberland and Reservoir/Recreation Facilities Zone/Natural Resource General Plan Land Use Designation
Document Description
The Forebay is a component of the El Dorado Hydroelectric Project, which is owned and operated by EID and licensed by FERC as FERC Project No. 184. EID operates Project No. 184. The El Dorado Forebay Dam modification project is required to satisfy specific state and federal dam safety mandates. Additionally, the project would improve the reliability of the drinking water supply and minimize impacts on EID ratepayers through optimized power generation revenue. The project involves constructing an earthen stability buttress on the dry side of the Forebay Dam, raising the Forebay Dam 10 vertical feet, and remediating associated facilities.

Contact Information

Name
Brian Deason
Agency Name
El Dorado Irrigation District
Contact Types
Lead/Public Agency

Location

Counties
El Dorado
Cross Streets
Forebay Road, Blair Road, Polaris Road, and Drop-off Road
Zip
95726
Total Acres
158
Parcel #
10133077, 10133011, 10133061, etc.
State Highways
Hwy 50
Schools
Pinewood ES
Waterways
American River
Township
11N
Range
12E
Section
25
Base
MDB&M
Other Location Info
Pollock Pines

Notice of Determination

Approving Agency
El Dorado Irrigation District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.