County Road 12 Bridge (22C0130) Over Zamora Creek Replacement Project

3 Documents in Project

Summary

SCH Number
2013032018
Lead Agency
Yolo County
Document Title
County Road 12 Bridge (22C0130) Over Zamora Creek Replacement Project
Document Type
NOD - Notice of Determination
Received

Document Description
The existing County Road 12 Bridge (22C0130) was built in 1930 as a two-lane, three-span arch, and reinforced concrete slab with parabolic soffits founded on reinforced concrete pier walls and abutments. The bridge is approximately 30 feet long and 23 feet wide. The purpose of the Replacement Project is to replace the structurally deficient, scour critical bridge with an approximately 36-foot 6 inches long, 34-foot 10 inches wide, single span, flat slab structure supported by diaphragm-type abutments with cast-in-drilled-hole piles. The new bridge will meet the American Association of State Highway and Transportation Officials guidelines for design, construction, and maintenance. Caltrans Standard Type 732 concrete barrier with metal beam guardrails will be used at the four corners of the bridge. Bridge approaches will be paved.

Contact Information
Stephanie Cormier
Yolo County Planning & Public Works Dept.
292 W. Beamer Street
Woodland, CA 95695

530 666 8850

Location

Coordinates
38°8'9"N 121°9'25"W
Counties
Yolo
Cross Streets
County Road 12, County Road 92
Zip
95698
Total Acres
3.05
Parcel #
055-110-003, 055-050-014
State Highways
I-5, 505
Railways
No
Airports
No
Schools
No
Waterways
Zamora, Willow Spring, and Bretona Creeks
Township
11N
Range
1E
Section
18
Base
MDB&M
Other Location Info
Zamora

Notice of Determination

Approving Agency
Yolo County Planning Commission
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
Yolo County Planning & Public Works Dept. 292 West Beamer Street Woodland, Ca

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
N/A
Download CSV New Search