Arcata Rail with Trail Connectivity Project

5 Documents in Project

Summary

SCH Number
2013032008
Lead Agency
City of Arcata
Document Title
Arcata Rail with Trail Connectivity Project
Document Type
NOD - Notice of Determination
Received
Posted
5/8/2013
Present Land Use
Multiple City zones - City & NCRA ROW, Natural Resource, Public Facility; Industrial Limited Resid. Low Density, Co. NR, MG
Document Description
The proposed Arcata Rail with Trail Connectivity Project involves construction, operation & maintenance of an approximately 4.5 mile long Class I, ADA accessible, non-motorized, multiuse, paved trail. The northern 3.25 miles of the project are located in the City of Arcata & the southern 1.25 miles are located in the County of Humboldt. The proposed project will run from northern Arcata (Larson Park), through the City & Arcata Marsh & Wildlife Sanctuary & along the eastern edge of Humboldt Bay south to the Highway 101 & Bracut intersection. The trail will be along or within the NCRA ROW, a portion of the western Highway 101 corridor, City-owned ROW, & cross private property. There will be a northern trailhead at Larson Park & southern trailhead north of the Bracut intersection. Safety features include fencing, physical barriers, signage and striping.

Contact Information

Name
Karen Diemer
Agency Name
City of Arcata
Contact Types
Lead/Public Agency

Location

Cities
Arcata
Counties
Humboldt
Cross Streets
Trail from Sunset Ave through Arcata and west of Hwy 101 to Bracut intersection
Zip
95521
Total Acres
4.5
Parcel #
multiple
State Highways
Hwy 101, 255
Railways
NCRA
Airports
No
Schools
Arcata HS
Waterways
Jolly Giant & Jacoby Creek, Gannon & Butcher Slough
Township
6N
Section
32

Notice of Determination

Approving Agency
City of Arcata
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print