Permit No. 19523: Yolo Bypass Salmonid Habitat Restoration and Fish Passage Project

10 Documents in Project

Summary

SCH Number
2013032004
Lead Agency
California Department of Water Resources (DWR)
Document Title
Permit No. 19523: Yolo Bypass Salmonid Habitat Restoration and Fish Passage Project
Document Type
NOD - Notice of Determination
Received
Posted
9/27/2021
Document Description
Approval of Permit No. 19523, under California Code of Regulations, Title 23, Article 3, Section 6, for work within an adopted plan of flood control: To construct four key facilities including a headworks structure, an intake channel from the Sacramento River to the headworks structure, a transport channel from the headworks structure to the Tule Pond, and downstream channel improvements. Additionally, work will be done to install a conduit with electrical and networking components to provide the Fremont Weir Adult Fish Passage Structure with permanent, reliable power and network connectivity.

Contact Information

Name
Jennifer Stewart
Agency Name
CVFPB
Contact Types
Responsible Agency

Location

Counties
Yolo
Regions
Northern California
Other Location Info
The project area includes the Fremont Weir, a portion of the Fremont Weir Wildlife Area, Tule Pond, Tule Canal, and one downstream agricultural road crossing of the Tule Canal. Fremont Weir is located adjacent to the Sacramento River, between River Mile (RM) 82 and RM 84, along the northern boundary of the Yolo Bypass, in Yolo County, California.

Notice of Determination

Approving Agency
Central Valley Flood Protection Board
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print