Vista Grande Drainage Basin Improvement Project (Lake Alteration Agreement No. EPIMS-SFO- 14833-R3)

7 Documents in Project

Summary

SCH Number
2013032001
Lead Agency
City of Daly City
Document Title
Vista Grande Drainage Basin Improvement Project (Lake Alteration Agreement No. EPIMS-SFO- 14833-R3)
Document Type
NOD - Notice of Determination
Received
Posted
8/30/2023
Document Description
This Project includes: 1) construction of a new Lake Merced outlet structure. 2) installation of a new floating pipe anchored to the lake bottom in South Lake. 3) modifications to the existing Lake Merced overflow structure in South Lake. 4) installation of a new gross solids debris screening device(s) deigned to remove trash and debris including plastics, from stormwaters diverted to Lake Merced and/or discharged into the Pacific Ocean. 5) an annual beach cleanup day which removes trash and plastic from the beaches and around Lake Merced area will be carried out annually by Daly City for a minimum of 5 years.

Contact Information

Name
Will Kanz
Agency Name
CDFW
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Location

Cities
San Francisco
Counties
San Francisco
Regions
Northern California, San Francisco Bay Area
Other Location Info
The Project is located at Lake Merced, South and Impound Lakes, San Francisco, San Francisco County, State of California; Latitude 37.71612, Longitude 122.49291, Assessor’s Parcel Number 728-3004.

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
County Clerk
San Francisco
Final Environmental Document Available at
2825 Cordelia Road, Suite 100 Fairfield, CA 94534

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print