Chatsworth Park South Remedial Action Plan
4 Documents in Project
Summary
SCH Number
2013031066
Lead Agency
City of Los Angeles
Document Title
Chatsworth Park South Remedial Action Plan
Document Type
NOD - Notice of Determination
Received
Posted
6/7/2013
Present Land Use
Parkland/OS1XL/Open Space
Document Description
The proposed Project consists of the implementation of a Remedial Action Plan (RAP) that will be approved by the CA Environmental Protection Agency DTSC under a Voluntary Cleanup Agreement with LADRP. The RAP proposes to cap in-place the soil impacted principally by lead and polycyclic aromatic hydrocarbons (PAHs) discovered in the park from a former Small Arms Firing Range. The surface cap would provide a permanent solution that reduces the accessibility and mobility of the impacted soils, and therefore, the threat to human health and the environment. The surface cap would be installed over remediation areas and would include utility clearance, security measures, rough grading and excavation, installation of a drainage system, construction of a surface cap, and installation of fencing.
Contact Information
Name
Paul Davis
Agency Name
City of Los Angeles, Dept. of Parks and Rec
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Los Angeles, Los Angeles, City of
Counties
Los Angeles
Cross Streets
Devonshire Street and Valley Circle Blvd
Zip
91311
Total Acres
72
Parcel #
2723-010-904
State Highways
SR 27, 118
Railways
SCRRA (metrolink)
Airports
No
Schools
Chatsworth Park ES
Waterways
No
Township
2N
Range
17W
Section
13
Base
SBB&M
Other Location Info
Chatsworth
Notice of Determination
Approving Agency
Board of Recreation and Park Commissioners of the City of LA
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.