Perris Middle School and Central Kitchen

2 Documents in Project

Summary

SCH Number
2013031021
Lead Agency
Perris Union High School District
Document Title
Perris Middle School and Central Kitchen
Document Type
NOD - Notice of Determination
Received

Document Description
The District proposes to construct and operate a new middle school and a central kitchen. The middle school would have 95,000 square feet of building area, including: a 70,000-square-foot main building with 35 classrooms, library/media room, multipurpose room, administration, and food service facility; and a 25,000-square-foot physical education building with a gymnasium and locker rooms. Outdoor athletic facilities would include two softball fields, a running track surrounding a football/soccer field, and hard courts. Approximately 190 parking spaces would be provided onsite for faculty, staff, and guests. The project also includes a self-contained central kitchen adjacent to the new Perris Middle School. The kitchen facility would be used for storage of foods and supplies, assembly of school meals, and consolidation and delivery of meals to schools, and a 30-space parking lot.

Contact Information
Fred Good
Perris Union High School District
155 East 4th Street
Perris, CA 92570

951 943 6369

Location

Coordinates
33°47'33.3"N 117°12'38.97"W
Cities
Perris
Counties
Riverside
Cross Streets
Patriot Lane at Murrieta Road
Zip
92570
Total Acres
26
Parcel #
Numerous
State Highways
Hwy 215, 74
Railways
BNSF
Airports
Perris
Schools
2 ES, 1HS
Waterways
Perris Valley Storm Drain
Township
4S
Range
3W
Section
29
Base
SBB&M

Notice of Determination

Approving Agency
Perris Union High School District
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
Perris Union High School District, 155 East 4th Street, Perris, CA 92570

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search