Marina Jetty Reconstruction

Summary

SCH Number
2013028274
Public Agency
California Department of Fish and Wildlife, Region 4 (CDFW)
Document Title
Marina Jetty Reconstruction
Document Type
NOE - Notice of Exemption
Received
Posted
2/27/2013
Document Description
The Project will reconstruct and existing breakwater jetty constructed of rock-filled steel gabions. The reconstructed jettey will be constructed of pre-cast concrete "UltraBlock," and will be of the same dimensions as the existing jetty, 20 feet 6-inches by 26 feet 6-inches. Starting at the far east end of the existing jetty, using the top of the jetty as a work platform, the steel gabions and rock will be removed, the ground will be placed in the lakebed. Next the north then south sides of the wall will be reconstructed in the same manner, working from east to west.

Contact Information

Name
Sarah Paulson
Agency Name
California Department of Fish and Wildlife, Region 4
Contact Types
Lead/Public Agency

Location

Counties
Tuolumne
Other Location Info
Groveland

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15302(c)
Reasons for Exemption
The reconstrcution of an existing breakwater jetty, the replacement jetty will be of the same dimensions. This project will have no significant environmental impacts.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.