Marsh Creek Detention Facility Bridge

3 Documents in Project

Summary

SCH Number
2013022059
Lead Agency
Contra Costa County
Document Title
Marsh Creek Detention Facility Bridge
Document Type
NOD - Notice of Determination
Received

Document Description
Project is limited to the replacement of an existing detention facility bridge over Marsh Creek and adjustment of 300 feet of roadway to accommodate the new bridge. The new bridge will be a 60 foot long, cast in place, pre-stressed concrete bridge with one 12 foot wide traffic lane and two, 2 foot wide shoulders with single beam barriers rails on both sides. The bridge will span Marsh Creek with no support piles in the creek bed. The creek will be graded 40 feet in the downstream end and require the installation of 60 linear feet of rock slope protection on both banks, and require the installation of a 120 linear feet temporary culvert system. A temporary road will be installed in the creek while the new bridge is being constructed. The Project is located at 12000 Marsh Creek Road in the city of Clayton, Contra Costa County, California. The CDFW is executing a Lake and Streambed Alteration Agreement No. 1600-0327-R3 pursuant to Section 1602 of the Fish and Game Code to the project Applicant, Contra Costa County Public Works Department.

Contact Information
Robert Stanley
California Department of Fish and Wildlife
7329 Silverado Trail
Napa, CA 94558

707-944-5573

Location

Coordinates
37°52'33"N 121°52'30"W
Cities
Clayton
Counties
Contra Costa
Zip
94517
Parcel #
078-120-011
Waterways
Marsh Creek
Township
1N
Range
1E
Section
33

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
Contra Costa County Public Works 255 Glacier Drive, Martinez, CA 94553.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A Statement of Overriding Considerations was adopted for this project
N/A
(5) Findings were made pursuant to the provisions of CEQA
N/A