Stampede Dam Safety of Dams Modification Project

3 Documents in Project

Summary

SCH Number
2013022046
Lead Agency
Regional Water Quality Control Board, Region 6 (Lahontan)
Document Title
Stampede Dam Safety of Dams Modification Project
Document Type
NOD - Notice of Determination
Received
Posted
5/24/2013
Document Description
To address safety deficiencies at Stampede Dam, U.S. Bureau of Reclamation has selected a structural alternative to increase the height of Stampede Dam and Stampede Dike by 11.5 feet and install two additional saddle dikes to protect outflow from topographic low spots along the south rim of the reservoir from the increased maximum capacity of the reservoir during a probable maximum flood. Suitable sources of borrow material sites were located near project features and will be used for construction. Other project elements include haul routes (located on already disturbed areas where feasible), staging areas, stockpiling areas, and log landings for use in clearing vegetation. Up to a total of 80.4 acres could be disturbed by the project.

Contact Information

Name
Alan Miller
Agency Name
Regional Water Quality Control Board, Region 6 (Lahontan)
Contact Types
Lead/Public Agency

Location

Cities
Truckee
Counties
Sierra
Cross Streets
Stampede Meadows Road and Dog Valley Road
Zip
96111
Total Acres
83
Parcel #
023-050-006, -007, -008, -009
State Highways
No
Railways
No
Airports
No
Schools
No
Waterways
Little Truckee River, Stampede Reservoir, Dry Creek
Township
19N
Range
15E
Section
28
Base
MDB&M

Notice of Determination

Approving Agency
Lahontan Regional Water Quality Control Board
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.