Parks Master Plan, Citywide Public Facilities Master Plan, and Citywide Public Safety Master Plan

2 Documents in Project

Summary

SCH Number
2013022031
Lead Agency
City of Tracy
Document Title
Parks Master Plan, Citywide Public Facilities Master Plan, and Citywide Public Safety Master Plan
Document Type
NOD - Notice of Determination
Received
Posted
4/18/2013
Present Land Use
Various
Document Description
The PFMP identifies specific policies, design guidelines, and preliminary capital costs associated with building new park and recreation infrastructure to serve future residential areas at buildout of the City's SOI. Both the PFMP and PSMP are intended to be used as guideline documents for the identification of public buildings needed to serve future land development projects under the buildout condition for the City's SOI (the PSMP specifically addresses the need for future public safety facilities [police and fire], while the PFMP addresses the future need for all other types of public buildings). In addition, the PFMP and PSMP respectively provide guidance regarding public building and public safety upgrades needed to adapt existing spaces to new or expanded uses. Both documents also serve as reference documents for existing public buildings and safety facilities.

Contact Information

Name
William Dean
Agency Name
City of Tracy
Contact Types
Lead/Public Agency

Location

Cities
Tracy
Counties
San Joaquin
Cross Streets
Various
Zip
95304

Notice of Determination

Approving Agency
City of Tracy
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print