Diamond Ranch High School Track and Field Renovations

2 Documents in Project

Summary

SCH Number
2013021007
Lead Agency
Pomona Unified School District
Document Title
Diamond Ranch High School Track and Field Renovations
Document Type
NOD - Notice of Determination
Received
Posted
4/4/2013
Present Land Use
High School Agricultural; School
Document Description
The project involves renovating the track and field at Diamond Ranch High School. The natural turf field and dirt track would be replaced with synthetic turf and a 400-meter, nine-lane, all-weather, synthetic rubberized running track. The astroturf would be painted for use as both a football and soccer field. Stairs would be installed between existing bleacher structures next to the south side of the track. Four new field light poles with speakers would be installed. A new restroom/concession building would also be constructed. The project would include a new drainage system to collect runoff from the new impervious areas to existing storm drains.

Contact Information

Name
Nathaniel Holt
Agency Name
Pomona Unified School District
Contact Types
Lead/Public Agency

Location

Cities
Diamond Bar
Counties
Los Angeles
Cross Streets
Diamond Ranch Drive and Philips Ranch Road
Zip
91765
Total Acres
10
Parcel #
8701-022-907
State Highways
Hwy 60, 71, 57
Railways
UPRR
Airports
No
Schools
5 ES, 1 MS, 1 HS
Waterways
Tonner Canyon
Township
2S
Range
9W
Section
1
Base
SBB&M

Notice of Determination

Approving Agency
Pomona Unified School District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print