Palo Alto Municipal Golf Course Reconfiguration and Baylands Athletic Center Expansion

3 Documents in Project

Summary

SCH Number
2013012053
Lead Agency
City of Palo Alto
Document Title
Palo Alto Municipal Golf Course Reconfiguration and Baylands Athletic Center Expansion
Document Type
NOD - Notice of Determination
Received
Posted
2/6/2014
Present Land Use
Public Parks
Document Description
The City of Palo Alto is proposing to reconfigure the Palo Alto Municipal Golf Course in response to the San Francisquito Creek Flood Reduction, Ecosystem Restoration, and Recreation Project San Francisco Bay to Highway 101, proposed by the SFCJPA, which would permanently incorporate 7.4 acres of the Golf Course into the SFCJPA's project. The Project would reconfigure all 18 holes of the Golf Course and a portion of the driving range and replace a restroom facility, while retaining a regulation golf course with a par of 71. The reconfigured Golf Course would be designed with a Baylands theme that would incorporate or modify the existing low-lying areas into the Golf Course. The City is proposing to incorporate 10.5 acres of the existing Golf modify the existing Course into the Baylands Athletic Center to be converted into up to five full-size soccer fields and a 24,100 sf gymnasium.

Contact Information

Name
Joe Teresi
Agency Name
City of Palo Alto
Contact Types
Lead/Public Agency

Location

Cities
Palo Alto
Counties
Santa Clara
Cross Streets
Embarcadero Road
Zip
94303
Total Acres
175.8
Parcel #
008-06-001 and 008-002-032
State Highways
SR 109
Airports
Palo Alto
Schools
International School of the
Waterways
San Francisquito Creek
Township
6S
Range
2W

Notice of Determination

Approving Agency
City of Palo Alto
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print