Palo Alto Municipal Golf Course Reconfiguration and Baylands Athletic Center Expansion

3 Documents in Project

Summary

SCH Number
2013012053
Lead Agency
Palo Alto, City of (City of Palo Alto)
Document Title
Palo Alto Municipal Golf Course Reconfiguration and Baylands Athletic Center Expansion
Document Type
NOD - Notice of Determination
Received

Document Description
The City of Palo Alto is proposing to reconfigure the Palo Alto Municipal Golf Course in response to the San Francisquito Creek Flood Reduction, Ecosystem Restoration, and Recreation Project San Francisco Bay to Highway 101, proposed by the SFCJPA, which would permanently incorporate 7.4 acres of the Golf Course into the SFCJPA's project. The Project would reconfigure all 18 holes of the Golf Course and a portion of the driving range and replace a restroom facility, while retaining a regulation golf course with a par of 71. The reconfigured Golf Course would be designed with a Baylands theme that would incorporate or modify the existing low-lying areas into the Golf Course. The City is proposing to incorporate 10.5 acres of the existing Golf modify the existing Course into the Baylands Athletic Center to be converted into up to five full-size soccer fields and a 24,100 sf gymnasium.

Contact Information
Joe Teresi
City of Palo Alto
250 Hamilton Avenue, 6th Floor
Palo Alto, CA 94301

(650) 329-2129

Location

Coordinates
37°27'26"N 122°7'6"W
Cities
Palo Alto
Counties
Santa Clara
Cross Streets
Embarcadero Road
Zip
94303
Total Acres
175.8
Parcel #
008-06-001 and 008-002-032
State Highways
SR 109
Airports
Palo Alto
Schools
International School of the
Waterways
San Francisquito Creek
Township
6S
Range
2W

Notice of Determination

Approving Agency
City of Palo Alto
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
http://www.cityofpaloalto.org/civicax/filebank/documents/38664

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
Yes
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search