San Pablo Avenue Bridge Replacement at Rodeo Creek

3 Documents in Project

Summary

SCH Number
2013012044
Lead Agency
Contra Costa County
Document Title
San Pablo Avenue Bridge Replacement at Rodeo Creek
Document Type
NOD - Notice of Determination
Received

Document Description
Project is limited to the replacement of an existing bridge over Rodeo Creek along San Pablo Avenue in Rodeo. The new bridge will be supported by 12 cast in, drilled hole, concrete piles that will be installed outside the channel. The existing bridge will be removed by de-watering of the area near the existing in-channel support columns and subsequent demolition of the deck and columns. The existing pile caps will be left in place. A sewage pipe and various utility lines will be temporarily relocated during demolition and construction. Equipment used will include truck mounted cranes, forklifts, flatbed trucks, air compressors, scaffolding, hand-held grinders, concrete trucks, boom trucks, loaders, dump trucks, compaction equipment, backhoes and trenchers. The project is located along San Pablo Avenue over Rodeo Creek in the community of Rodeo, Contra Costa County, in the State of California. CDFW is executing a Lake and Streambed Alteration Agreement No. 1600-2013-0330-R3 pursuant to Section 1602 of the fish and Game Code to the project Applicant, Steve Kowalewski, on behalf of the Contra Costa County Public Works Department.

Contact Information
Robert Stanley
California Department of Fish and Wildlife
Bay Delta Region 7329 Silverado Trail
Napa, CA 94558

925 313 2311

Location

Coordinates
38°2'18"N 122°16'35"W
Counties
Contra Costa
Cross Streets
Railroad Avenue and Parker Avenue
Zip
94572
Total Acres
.79
State Highways
SR 4, I-80
Railways
UPRR
Waterways
San Pablo Bay
Township
2N
Range
4W
Base
MDB&M
Other Location Info
Rodeo

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
255 Glacier Drive, Martinez, CA 94553.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A Statement of Overriding Considerations was adopted for this project
N/A
(5) Findings were made pursuant to the provisions of CEQA
N/A