Pioneer Bluff Bridge

8 Documents in Project

Summary

SCH Number
2013012030
Lead Agency
West Sacramento, City of (City of West Sacramento)
Document Title
Pioneer Bluff Bridge
Document Type
NOD - Notice of Determination
Received
Posted
3/6/2013
Present Land Use
Arterial Roadway, Waterfront (WF), Recreations and Parks (RP)

Document Description
The project will construct a bridge connecting the existing two lanes South River Road cul-de-sac on the north side of the Barge Canal with South River Road on the south side of the canal. The bridge will be approximately 615 feet long, 80 feet wide and will include one 12 foot lane in each direction, one future un-striped lane in each direction, a raised median, 4-6 foot shoulders, and two 6 foot walkways separated from traffic by a concrete barrier. The project will also construct roadway and drainage improvements of the South River Road approaches and install a signal at the 15th Street/South River Road intersection.

Contact Information
Jay Davidson
City of West Sacramento
1110 W. Capitol Avenue
West Sacramento, CA 95691

Phone : (916) 617-4645

Location

Coordinates
38°33'40.8"N 121°31'24.3"W
Cities
West Sacramento
Counties
Yolo
Cross Streets
South River Road and Barge Canal
Zip
95691
Total Acres
5
Parcel #
0671800010
State Highways
I-5, 50, SR-99, 275
Railways
UPRR
Airports
Sacramento Executive
Schools
Stonegate ES
Waterways
Sacramento River Deep Water Ship Channel
Township
8N
Range
4E
Base
MDB&M

Notice of Determination

Approving Agency
California Transportation Commission
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
City of West Sacramento, 1110 West Capitol Avenue, West Sacramento, CA 95691

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print