Pioneer Bluff Bridge
8 Documents in Project
Summary
SCH Number
2013012030
Lead Agency
City of West Sacramento
Document Title
Pioneer Bluff Bridge
Document Type
NOD - Notice of Determination
Received
Posted
2/22/2013
Present Land Use
Arterial Roadway, Waterfront (WF), Recreations and Parks (RP)
Document Description
The City of West Sacramento proposes to build a bridge that will connect the existing two-lane South River Road from the South River Road cul-de-sac on the north side of the Barge Canal to South River Road on the south side of the Barge Canal. The bridge will include one 12-foot lane in each direction and one future un-striped 12-foot lane in each direction, a 2-foot raised median, two 4 to 6-foot shoulders, and two 6-foot walkways separated from traffic by a concrete barrier. The project will signalize the intersection of 15th Street and South River Road. The purpose of the Pioneer Bluff Bridge Project is to construct a bridge that connects South River Road across the Barge Canal.
Contact Information
Name
Jay Davidson
Agency Name
City of West Sacramento
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
West Sacramento
Counties
Yolo
Cross Streets
South River Road and Barge Canal
Zip
95691
Total Acres
5
Parcel #
0671800010
State Highways
I-5, 50, SR-99, 275
Railways
UPRR
Airports
Sacramento Executive
Schools
Stonegate ES
Waterways
Sacramento River Deep Water Ship Channel
Township
8N
Range
4E
Base
MDB&M
Notice of Determination
Approving Agency
City of West Sacramento
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.