Oak Park Combined Sewer System Regional Storage Facility

2 Documents in Project

Summary

SCH Number
2013012029
Lead Agency
City of Sacramento
Document Title
Oak Park Combined Sewer System Regional Storage Facility
Document Type
NOD - Notice of Determination
Received
Posted
3/7/2013
Present Land Use
PLU: undeveloped open space on existing City park property Z: Standard Single Family (R-1) and Multi-Family (R-2A); GPD: Parks and Recreation
Document Description
The project includes the construction and operation of an underground storage facility that would function as a component of the City's Combined Sewer System (CSS). The facility would provide storage during heavy rainfall periods in order to lower the hydraulic grade line, which would regionally and locally reduce the potential for flooding and combined sewer outflows. Combined sewage from the City's CSS would be piped to the project site and temporarily stored during heavy rainfall periods, then would be metered out once flows have again reduced. The facility would fill and empty via gravity flow; however, two small pumps are anticipated to be required in order to completely empty the facility. Although the proposed project would be part of the City's CSS, because storage would occur during heavy rainfall periods only, the majority of water stored would be storm water (i.e., typically 90 to 95 percent) with a minority of sewage.

Contact Information

Name
Scott Johnson
Agency Name
City of Sacramento
Contact Types
Lead/Public Agency

Location

Cities
Sacramento
Counties
Sacramento
Cross Streets
8th Avenue and San Carlos Way
Zip
95817
Total Acres
2.6
Parcel #
014-0231-048, -043, -047
State Highways
SR 99, Hwy 50, I-80
Railways
UPRR
Schools
Various
Township
8N
Range
5E
Section
18
Base
MDB&M

Notice of Determination

Approving Agency
City of Sacramento, City Council
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print