OCCD Revised Northeast Parking Project - Addendum No. 2 to 2012 DFMP FEIR

5 Documents in Project

Summary

SCH Number
2013012021
Lead Agency
Ohlone Community College District
Document Title
OCCD Revised Northeast Parking Project - Addendum No. 2 to 2012 DFMP FEIR
Document Type
NOD - Notice of Determination
Received
Posted
1/12/2017
Present Land Use
Public Facility
Document Description
The Northeast Parking project eliminates the previously proposed Parking Structure P1 and reconfigures three existing parking lots. Instead of 639 spaces under the 2012 DFMP for this area (540 spaces in Parking Structure P1 and 99 spaces on Lots U and W), the revised parking project includes up to 300 spaces on reconfigured Lots T, U, and W. As there are 103 spaces currently on the three lots, the revised Northeast Parking project would result in a net increase of 197 spaces in this portion of the campus. The parking would be used by students, staff and faculty. The project includes a new approx. 2,000 sq. ft. storage building north of Building 22.

Contact Information

Name
Robert Dias
Agency Name
Ohlone Community College District
Contact Types
Lead/Public Agency

Location

Cities
Fremont
Counties
Alameda
Cross Streets
Mission Boulevard and Witherly Lane
Zip
94539
State Highways
Hwy 238, 680
Schools
Mission San Jose ES

Notice of Determination

Approving Agency
Ohlone College Community District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print