Solar Project at the Richmond Field Station

6 Documents in Project

Summary

SCH Number
2013012007
Lead Agency
University of California, Berkeley
Document Title
Solar Project at the Richmond Field Station
Document Type
NOD - Notice of Determination
Received
Posted
12/8/2021
Document Description
UC Berkeley proposes solar photovoltaic (PV) array ground installations in two site locations at the Richmond Field Station. The first site is a rectangular site directly west of the Northern Regional Library Facility, along Regatta Boulevard. The second site is on an irregularly shaped site bounded by South 46th Street, Egret Way, Plover Drive, and Jay Way. This site is south of the Earthquake Engineering Center on a former hydrogen fueling station. The project will also include conduit for future electric vehicle charging. Anticipated solar system size for the two locations is 900 KW and would produce about 1.4 kWh a year which would meet approximately 30 percent of the site’s power needs. The panels will be mounted on concrete piers with consistent spacing. Planning for the Project is guided by the 2014 LRDP for the Richmond Bay Campus.

Contact Information

Name
Shraddha Navalli Patil
Agency Name
UC Berkeley
Job Title
Senior Planner
Contact Types
Lead/Public Agency

Name
Wendy Hillis
Agency Name
UC Berkeley
Job Title
Campus Architect
Contact Types
Lead/Public Agency

Location

Cities
Richmond
Counties
Contra Costa
Regions
Citywide
Parcel #
5600600008

Notice of Determination

Approving Agency
UC Berkeley
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (2014 LRDP EIR; CEQA Findings)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Final Document(s) [Approved_Certified draft environmental documents]

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print