Richmond Bay Campus 2013 Long Range Development Plan and Phase 1 Development

6 Documents in Project

Summary

SCH Number
2013012007
Lead Agency
University of California
Document Title
Richmond Bay Campus 2013 Long Range Development Plan and Phase 1 Development
Document Type
NOD - Notice of Determination
Received
Posted
5/16/2014
Present Land Use
Business/Light Industrial and Open Space
Document Description
The Berkeley campus, in a joint proposal with UC Lawrence Berkeley National Laboratory, proposes to establish a new research campus entitled the Richmond Bay Campus (RBC) on the site of the UC Berkeley Richmond Field Station and nearby Regatta property owned by the University of California within the City of Richmond, CA. The proposed Long Range Development Plan (LRDP) indicates how approximately 5.4 million gross square feet (gsf) of research and development office/laboratory space and supporting facilities would be allocated on the 134.1 developable acres over a 40-year time period. It is projected that 650,000 gsf of existing facilities would remain on site and thus 4.75 million gsf of new space is planned to be developed. Ultimately a population of approximately 10,000 is projected to be located on site. The Plan preserves approximately 25 acres as natural open space, including marsh and coastal terrace prairie grasslands. In parallel with preparing the LRDP and the LRDP EIR for the RBC, UC Berkeley developed and submitted to the Department of Toxic Substance Control (DTSC) a draft Removal Action Workplan (RAW) for the Richmond Field Station portion of the RBC; this was published in November 2013 for public comment. The public had a 45-day review period that paralleled the draft LRDP review period. Impacts of implementing the RAW were analyzed in the LRDP EIR. DTSC has stated that it intends to consider the RAW for approval after the Regents makes its determination on the RBC LRDP and LRDP EIR.

Contact Information

Name
Jennifer McDougal
Agency Name
University of California
Contact Types
Lead/Public Agency

Location

Cities
Richmond
Counties
Contra Costa
Cross Streets
S. 46th Street and Seaver Avenue
Zip
94804
Total Acres
134
Parcel #
5600600008
State Highways
I-580, I-80, SR 123
Railways
UPRR, Bart
Schools
Kennedy, Coronado
Waterways
San Francisco Bay

Notice of Determination

Approving Agency
University of California
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print