Removal Action Workplan for the Pistol Range, Stege Property

2 Documents in Project

Summary

SCH Number
2013012004
Lead Agency
Department of Toxic Substances Control
Document Title
Removal Action Workplan for the Pistol Range, Stege Property
Document Type
NOD - Notice of Determination
Received
Posted
4/3/2013
Present Land Use
Open Space
Document Description
DTSC, pursuant to regulatory authority granted under Chapter 6.8 of the Health and Safety Code (H&SC), is considering approving a draft Removal Action Workplan (RAW) that was submitted on December 19, 2012 by CH2MHill for the Stage Property Pistol Range (Site). The purpose of the proposed project is to minimize human exposure to lead-impacted soils by excavation and removal to an off-site permitted facility. The estimated volume of impacted soil planned for removal from the Site is approximately 4,800 cubic yards (yds3) or approximately 300 truckloads. Approximately 5,600 yds3 of backfill soil is available on-site and will be used to fill in the excavated areas. The remaining soil will be redistributed to restore the Site, resulting in a two-foot thick layer of soil above the surrounding grade. If additional soil is needed, clean fill material will be imported from off-site sources consistent with DTSC's Information Advisory - Clean Imported Fill Material (October 2001). The maximum level of lead found at the site was 209,000 milligrams per kilogram (mg/kg) and the cleanup goal is 320 mg/kg.

Contact Information

Name
Lynn Nakashima
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency

Location

Cities
Richmond
Counties
Contra Costa
Cross Streets
Bayview Avenue
Zip
94804
Total Acres
2.45
Parcel #
560010043
State Highways
I-580 and 80
Railways
UPRR
Airports
No
Schools
Various
Waterways
San Francisco Bay
Township
1N
Range
4W
Section
29

Notice of Determination

Approving Agency
DTSC
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print