Garey High School Track and Field Renovations

2 Documents in Project

Summary

SCH Number
2013011030
Lead Agency
Pomona Unified School District
Document Title
Garey High School Track and Field Renovations
Document Type
NOD - Notice of Determination
Received

Document Description
The proposed project involves renovating the track and field at Garey High School. The natural turf field and dirt track would be replaced with synthetic astroturf and a 400-meter, nine-lane, all-weather, synthetic rubberized running track. The synthetic turf would be painted for use as football and soccer fields. Home and visitor aluminum bleachers would be installed totaling 1,498 spectator seats, an increase of 998 seats. Four new light poles with speakers would be installed. A new restroom/concession building would also be constructed. New landscape would be planted, and a sprinkler system to water the new landscape and to cool down the astroturf would be installed. The project includes a new drainage system to collect runoff from new impervious areas; the runoff would be collected in subsurface pipes.

Contact Information
Nathaniel Holt
Pomona Unified School District
800 South Garey Avenue
Pomona, CA 91769

909 397 4800 x3902

Location

Coordinates
34°2'20"N 117°45'1"W
Cities
Pomona
Counties
Los Angeles
Cross Streets
Garey Avenue and Lexington Avenue
Zip
91766
Total Acres
10
Parcel #
8344-021-901
State Highways
Hwy 60, 71, I-10
Railways
UPRR / Metrolink
Airports
No
Schools
4 ES, 2 Charter, 1 pvt./parochial
Waterways
Chino Creek, San Antonio Channel
Township
1S
Range
8W
Section
32
Base
SBB&M

Notice of Determination

Approving Agency
Pomona Unified School District
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
Pomona Unified School District 800 South Garey Avenue Pomona, CA 91766

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search