Giffith Park Crystal Springs New Baseball Fields Project (W.O. #E170110B)

3 Documents in Project

Summary

SCH Number
2013011012
Lead Agency
Los Angeles, City of (City of Los Angeles)
Document Title
Giffith Park Crystal Springs New Baseball Fields Project (W.O. #E170110B)
Document Type
NOD - Notice of Determination
Received

Document Description
The City of Los Angeles is proposing to construct two new youth baseball fields within the existing Crystal Springs Picnic Area of Griffith Park. Each baseball field would consist of a natural grass and dirt playing surface, two dugouts, bleachers, outfield/perimeter fencing and scoreboards. The project also includes landscaping and an irrigation system and will modify the existing access loop driveway by constructing a cul-de-sac at each terminus of the impacted loop driveway segment. The project would eliminate five parking spaces and require the relocation of seven picnic tables. It is estimated that the project will require the removal of forty-five trees; these trees will be relocated or replaced in accordance with applicable City policies.

Contact Information
Maria Martin
City of Los Angeles, Bureau of Engineering
1149 S. Broadway, Suite 600
Los Angeles, CA 90015-2213

213 485 5753

Location

Coordinates
34°7'58"N 118°16'36"W
Cities
Los Angeles Los Angeles, City of
Counties
Los Angeles
Cross Streets
Crystal Springs Drive/Griffith Park Drive
Zip
90027
Total Acres
4
Parcel #
5593002906
State Highways
Hwy 2, 134
Railways
Parrallel to & east of I-5
Airports
No
Schools
Glenfeliz Blvd ES
Waterways
Los Angeles River
Other Location Info
Griffith Park

Notice of Determination

Approving Agency
Board of Recreation and Park Commissioners
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
Office of the City Clerk, Room 395 of City Hall, and in the files of the Bureau of Engineering, 1149 South Boradway, Suite 600, Los Angeles, CA 90015-2213.

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
Yes
(5) Findings were made pursuant to the provisions of CEQA
N/A
Download CSV New Search