Giffith Park Crystal Springs New Baseball Fields Project (W.O. #E170110B)
3 Documents in Project
Summary
SCH Number
2013011012
Lead Agency
City of Los Angeles
Document Title
Giffith Park Crystal Springs New Baseball Fields Project (W.O. #E170110B)
Document Type
NOD - Notice of Determination
Received
Posted
4/14/2014
Present Land Use
Open Space/OS-1XL
Document Description
The City of Los Angeles is proposing to construct two new youth baseball fields within the existing Crystal Springs Picnic Area of Griffith Park. Each baseball field would consist of a natural grass and dirt playing surface, two dugouts, bleachers, outfield/perimeter fencing and scoreboards. The project also includes landscaping and an irrigation system and will modify the existing access loop driveway by constructing a cul-de-sac at each terminus of the impacted loop driveway segment. The project would eliminate five parking spaces and require the relocation of seven picnic tables. It is estimated that the project will require the removal of forty-five trees; these trees will be relocated or replaced in accordance with applicable City policies.
Contact Information
Name
Maria Martin
Agency Name
City of Los Angeles, Bureau of Engineering
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Los Angeles, Los Angeles, City of
Counties
Los Angeles
Cross Streets
Crystal Springs Drive/Griffith Park Drive
Zip
90027
Total Acres
4
Parcel #
5593002906
State Highways
Hwy 2, 134
Railways
Parrallel to & east of I-5
Airports
No
Schools
Glenfeliz Blvd ES
Waterways
Los Angeles River
Other Location Info
Griffith Park
Notice of Determination
Approving Agency
Board of Recreation and Park Commissioners
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.