South Orange County Reliability Enhancement (SOCRE) Project

6 Documents in Project

Summary

SCH Number
2013011011
Lead Agency
California Public Utilities Commission (CPUC)
Document Title
South Orange County Reliability Enhancement (SOCRE) Project
Document Type
NOD - Notice of Determination
Received
Posted
4/13/2020
Document Description
The Applicant proposes to rebuild the existing Capistrano Substation in order to increase its capacity as well as rebuilding and upgrading an existing transmission line that runs between the Capistrano Substation and the Talega substation. Location 4B within the Project will require the installation of a new transmission tubular steel pole (TSP) and a 125-foot by 35-foot maintenance pad to accommodate the reconfiguration of the existing transmission line. The maintenance pad will be maintained free of vegetation and provide a safe work area for the use of vehicles, equipment, and materials by personnel during maintenance activities.

Contact Information

Name
Darren Bradford
Agency Name
RWQCB - San Diego Region
Contact Types
Lead/Public Agency

Name
Agency Name
San Diego Gas and Electric (SDG&E)
Contact Types
Project Applicant

Location

Cities
San Clemente
Counties
Orange
Other Location Info
Dirt access road located off Calle Avanzado,

Notice of Determination

Approving Agency
RWQCB - San Diego Region
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.