Agreement 2012-0104-R4 - PG&E Sand Bar Dam Gaging Weir and Cableway

Summary

SCH Number
2012128263
Public Agency
Fish & Game #4
Document Title
Agreement 2012-0104-R4 - PG&E Sand Bar Dam Gaging Weir and Cableway
Document Type
NOE - Notice of Exemption
Received
Posted
12/20/2012
Document Description
Replacement of existing gaging weir and construction of a cableway for Federal Energy Regulatory Commission (FERC) re-licensing of the Spring Gap-Stanislaus Hydroelectrict Project (FERC #2130). The Project is limited to: Demolishing and removing existing weir and portion of the north wing wall to receive new, widened weir structure. Relocating approximately 10 cubic yards of rock and boulder material within the channel to fit formwork and place approximately 25 cubic yards of concrete for the weir and north wing wall restoration in the channel via helicopter, line pump, or boom pump. Water will be temporarily diverted areound the construction site.

Contact Information

Name
Sarah Bahm
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Sonora
Counties
Tuolumne

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
15301, 15303 - Class 1 & 3
Reasons for Exemption
Replacement of existing gaging weir with larger structure and construction of a cableway at an exisitng dam.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print