Spring Valley Lake Project (Lake or Streambed Alteration Agreement No. 1600-2014-0025-R2)

3 Documents in Project

Summary

SCH Number
2012122043
Lead Agency
Lake County
Document Title
Spring Valley Lake Project (Lake or Streambed Alteration Agreement No. 1600-2014-0025-R2)
Document Type
NOD - Notice of Determination
Received
Posted
5/2/2016
Present Land Use
Open Space, Public Facilities
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2014-0025-R2, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Lake County Special Districts. The project is limited to the restoration of Spring Valley Lake and the diversion of water from Wolf Creek and North Fork Cache Creek for storage in Spring Valley Lake, Water diverted into Spring Valley Lake consists of approx. one cubic foot per second (cfs) from Wolf Creek between Oct. 1 and July 1, and up to 300 acre feet per year of water from North Fork Cache Creek, which is allocated from the Yolo County Flood Control and Conservation District. During the year the Permittee will bypass a minimum of 10 cfs or the total streamflow shall be bypassed, whichever is less. The restoration project is to reclaim the water volume and area of the original reservoir and dam capacity of 320 acre-feet, the current volume is approx. 43 acre-feet. The reclaimed lake is anticipated to provide water for wild fire suppression as well as backup domestic water supply in the event of a prolonged drought.

Contact Information

Name
Tanya Sheya
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Cities
Clearlake
Counties
Lake
Zip
95423
Parcel #
062-241-02; various
State Highways
Hwy 20
Waterways
Spring Valley Lake Reservoir
Township
14N
Range
7W
Base
MDB&M
Other Location Info
Spring Valley Lake Subd.

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.