Lake and Streambed Alteration Agreement No. 1600-2013-0219-R1 Big River Instream Coho Habitat Enhancement Project
29 Documents in Project
Summary
SCH Number
2012122042
Lead Agency
Fish & Game #2
Document Title
Lake and Streambed Alteration Agreement No. 1600-2013-0219-R1 Big River Instream Coho Habitat Enhancement Project
Document Type
NOD - Notice of Determination
Received
Posted
8/15/2013
Document Description
The Project is limited using heavy equipment to excavate and remove sediment that has accumulated above the culvert inlet. The fill around the culvert and standpipe will be excavated down to the natural channel bed and the original valley hill slopes will be exhumed to the extent possible. The culvert and standpipe will remain intact and in place. Equipment operators will excavate a channel through the Eel River. The general design will entail the construction of a 15 foot wide channel with a consistent 3 percent channel grade and the stream side slopes will be sloped back to bedrock or a stable 2:1 slope angle.
Contact Information
Name
Scott Monday
Agency Name
California Department of Fish and Wildlife
Contact Types
Lead/Public Agency
Phone
Location
Cities
Goleta
Counties
Mendocino, Santa Barbara
Regions
Statewide
Other Location Info
Various Coastal Counties
Notice of Determination
Approving Agency
California Department of Fish and Wildlife
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.