Marysville Wastewater Treatment Plant Compliance Project

12 Documents in Project

Summary

SCH Number
2012122018
Lead Agency
City of Marysville
Document Title
Marysville Wastewater Treatment Plant Compliance Project
Document Type
NOD - Notice of Determination
Received
Posted
5/22/2018
Present Land Use
Mixed - Primary and secondary open space, general commercial, exclusive ag, residential, light and general industrial
Document Description
Approval of Permit No. 343-1, under CA Code of Regulations, Title 23, Section 6, for work within an adopted plan of flood control, within a Regulated Stream (Table 8.1; Title 23, Div. 1, Article 8): To install one(1) tee valve to the existing 12-inch diameter pipe crossing the right (west) bank levee of the Yuba River for future installation of a new 18-inch diameter welded steel pipe up and over the levee; To construct a new pipeline across the left (east) bank of the Yuba River floodway to connect existing pipelines from the City's Wastewater Treatment Plant to the Linda County Water District Regional Wastewater Treatment Facility.

Contact Information

Name
James Herota
Agency Name
Central Valley Flood Protection Board
Contact Types
Lead/Public Agency

Location

Cities
Marysville
Counties
Yuba
Cross Streets
Biz Johnson Drive and 1st St: Myrma Ave and Feather River Blvd
Zip
95901
Parcel #
Varies
State Highways
70, 20
Railways
Union Pacific RR
Airports
Yuba County Airport
Schools
Cedar Ln Elementary
Waterways
Yuba River, Feather River

Notice of Determination

Approving Agency
Central Valley Flood Protection Board
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print