Marysville Wastewater Treatment Plant Compliance Project

8 Documents in Project

Summary

SCH Number
2012122018
Lead Agency
Marysville, City of (City of Marysville)
Document Title
Marysville Wastewater Treatment Plant Compliance Project
Document Type
NOD - Notice of Determination
Received

Document Description
Approval of Permit No. 343-1, under CA Code of Regulations, Title 23, Section 6, for work within an adopted plan of flood control, within a Regulated Stream (Table 8.1; Title 23, Div. 1, Article 8): To remove and replace 200 feet of existing concrete pipe parallel to the levee with a 30-inch diameter cement and mortar lined and coated steel pipe: to remove and replace 870 feet of existing pipe with a 30-inch diameter cement and mortar lined and coated steel pipe; To remove and replace 80 feet of existing outfall pipe with a new 30-inch diameter cement and mortar lined coated steel pipe; To place fill on scour area and install erosion control at the outfall location.

Contact Information
James Herota
Central Valley Flood Protection Board
3310 El Camino Ave., suite 170
Sacramento, CA 95821

916-464-4644

Location

Coordinates
39°08'07"N 121°35'35"W
Cities
Marysville
Counties
Yuba
Cross Streets
Biz Johnson Drive and 1st St: Myrma Ave and Feather River Blvd
Zip
95901
Parcel #
Varies
State Highways
70, 20
Railways
Union Pacific RR
Airports
Yuba County Airport
Schools
Cedar Ln Elementary
Waterways
Yuba River, Feather River

Notice of Determination

Approving Agency
Central Valley Flood Protection Board
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
3310 El Camino Ave., Suite 170, Sacramento, CA 95821

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search