Accelerated Water Meter Project - Subsequent Project Within the Scope of the 2035 General Plan Master Environmental Impact Report (LR12-003)

14 Documents in Project

Summary

SCH Number
2012122006
Lead Agency
City of Sacramento
Document Title
Accelerated Water Meter Project - Subsequent Project Within the Scope of the 2035 General Plan Master Environmental Impact Report (LR12-003)
Document Type
NOD - Notice of Determination
Received
Posted
5/11/2017
Present Land Use
Various LUD; Primarily Residential zones and GP Desig
Document Description
The proposed project would install approx. 25,700 water meters on existing residential and commercial water service connections. The proposed project also involves replacement of approx. 62 miles of existing distribution and transmission mains primarily in existing City streets right-of-way. The City prepared an IS to: (a) review the discussions of cumulative impacts, growth inducing impacts, and irreversible significant effects in the 2035 General Plan Master EIR to determine their adequacy for the project (see CEQA Guidelines Section 15178(b), (c)); and (b) identify any potential new or additional project-specific significant environmental effects that were not analyzed in the Master EIR and any mitigation measures or alternatives that may avoid or mitigate the identified effects to a level of insignificance, if any. As part of the Master EIR process, the City is required to incorporate all feasible mitigation measures or feasible alternatives appropriate to the project as set forth in the Master EIR (CEQA Guidelines Section 15177(d)). Policies included in the 2035 General Plan that reduce significant impacts identified in the Master EIR and Master EIR mitigation measures were identified and discussed, as appropriate, in the IS. Based on analysis contained in the IS, the City has determined that the proposed project would not result in any additional significant environmental effect not previously analyzed in the Master EIR. No new additional mitigation measures or alternatives are required.

Contact Information

Name
Scott Johnson
Agency Name
City of Sacramento
Contact Types
Lead/Public Agency

Location

Cities
Sacramento
Counties
Sacramento
Cross Streets
Citywide

Notice of Determination

Approving Agency
City of Sacramento
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.