South Fork Wastewater Facilities Planning
2 Documents in Project
Summary
SCH Number
2012121073
Lead Agency
Madera County
Document Title
South Fork Wastewater Facilities Planning
Document Type
NOD - Notice of Determination
Received
Posted
3/25/2013
Present Land Use
Commercial Rural SF / Rural Urban
Document Description
The County of Madera proposes to plan design and construct a wastewater collection and conveyance system for the South Fork community to allow many of the existing septic tanks and the failing North Fork Mill Housing Facility private wastewater system to be taken out of service. The system is expected to consist of a gravity wastewater collection system, a wastewater pump station, and sewer force main. The gravity wastewater collection system would convey wastewater from the properties served to the pump station, where it would pump via the force main to another gravity wastewater collection system then discharge to the existing treatment system for the community of North Fork. Wastewater from South Fork would be treated and disposed of along with wastewater from North Fork. This will include the construction of 40inch sewer force main line running along the primary alignment with a pump station including submersible wastewater pumps and a 8-inch gravity sewer collection system with connection to existing South Fork users.
Contact Information
Name
Mr. Robert Mansfield
Agency Name
Madera County - Engineering Dept.
Contact Types
Lead/Public Agency
Phone
Location
Counties
Madera
Cross Streets
Road 225 and Road 274
Zip
93643
State Highways
No
Railways
No
Airports
No
Schools
No
Waterways
North and South Fork Willow Creeks
Township
8S
Range
23E
Section
18&19
Base
MDB&M
Other Location Info
City/Nearest Community: North Fork
Notice of Determination
Approving Agency
Madera County Dev. Review Committee
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.