Syphon Reservoir Interim Facilities Project

2 Documents in Project

Summary

SCH Number
2012121035
Lead Agency
Irvine Ranch Water District
Document Title
Syphon Reservoir Interim Facilities Project
Document Type
NOD - Notice of Determination
Received
Posted
1/31/2013
Present Land Use
Preservation
Document Description
The IRWD is proposing the construction of interim facilities at the base of the Syphon Reservoir to allow IRWD to operate the reservoir for recycled water use. The proposed facilities include a covered and fenced concrete approximately 3,600-sf pad housing chlorination equipment, bulk hypochlorite storage, and metering pumps; mechanical strainers; a backwash water supply pump and lift station; air compressor and piping for the temporary reservoir aeration system; and backwash force main and drainage facilities to connect to a new 48-inch storm drain pipe. Other proposed facilities are an electrical line and transformer, an approximately 15-foot-wide gravel access road, a domestic water pipeline, emergency drain, recycled water line and storm drain.

Contact Information

Name
Jo Ann Corey
Agency Name
Irvine Ranch Water District
Contact Types
Lead/Public Agency

Location

Cities
Irvine
Counties
Orange
Cross Streets
Sand Canyon Avenue and Portola Parkway
Zip
92626
Total Acres
6.39
State Highways
SR-133
Schools
Stonegate Elementary
Waterways
Syphon Reservoir

Notice of Determination

Approving Agency
Irvine Ranch Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print