Del Lago Transit Center Electric Vehicle Supply Equipment
Summary
SCH Number
2012118021
Public Agency
San Diego Association of Governments
Document Title
Del Lago Transit Center Electric Vehicle Supply Equipment
Document Type
NOE - Notice of Exemption
Received
Posted
11/2/2012
Document Description
The Del Lago Transit Center is currently under construction to add bus bays and additional parking to an existing park and ride facility. This project would include the construction of three electric vehicle charges (one DC Fast Charger and two Level 2 Chargers) in the northwest corner of the parking lot. Each charger would service two parking spaces each (including one space with ADA access). The carging units would be mounted to the ground on concrete pads. A photovoltaic canopy would cover the spaces to generate solar power for the charging units. The canopy would measure approximately 40 x 80 feet and stand approximately 12 feet high. An energy storage battery and supporting infrastructure would be enclosed in an approximately 20 x 30 foot structure (nine feet in height).
Contact Information
Name
Rob Rundle
Agency Name
San Diego Association of Governments
Contact Types
Lead/Public Agency
Phone
Location
Cities
Escondido
Counties
San Diego
Notice of Exemption
Exempt Status
Statutory Exemption
Type, Section or Code
15275 (a)
Reasons for Exemption
CEQA does not apply to transit projects that include the institution or increase in passenger or commuter service on high-occupancy vehicle lanes already in use, including the modernization of existing stations and parking facilities.
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.