Flag Canyon Creek Bridge Replacement

5 Documents in Project

Summary

SCH Number
2012112057
Lead Agency
California Department of Transportation, District 3
Document Title
Flag Canyon Creek Bridge Replacement
Document Type
NOD - Notice of Determination
Received
Posted
6/20/2013
Present Land Use
agriculture and grazing land
Document Description
Caltrans proposes to replace the existing Flag Canyon Creek Bridge structure (Br. No. 12-0140) on SR 70 in Butte County at post mile 23.91/24.46. The project will replace the existing 3-span bridge with a wider single span bridge. The new bridge would be on the existing tangent alignment; it would be approximately 100-foot long with two 12-foot lanes and standard 8-foot shoulders. The purpose of this project is to preserve the integrity of the transportation facility by replacing the Flag Canyon Creek Bridge. This project is needed to address the bridge's scour critical condition and settlement issues. Replacing the existing structure will ensure the integrity of the SR 70 system through this area of Butte County.

Contact Information

Name
Suzanne Melim
Agency Name
California Department of Transportation, District 3
Contact Types
Lead/Public Agency

Location

Cities
Oroville
Counties
Butte
Cross Streets
Wheelock Road
Zip
95965
State Highways
Hwy 70
Railways
UPRR
Airports
No
Schools
No
Waterways
Flag Canyon Creek

Notice of Determination

Approving Agency
Caltrans
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print