Bikeway Improvements on Foothill Blvd at San Dimas Wash

Summary

SCH Number
2012112021
Lead Agency
City of San Dimas
Document Title
Bikeway Improvements on Foothill Blvd at San Dimas Wash
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Various
Document Description
The City proposes to widen the Foothill Boulevard Bridge by constructing separate bridge structures at both the north and south ends of the existing San Dimas Wash box culvert to match the appropriate width. The new bridge structures would be 35 feet long and would consist of a single-span reinforced concrete slab supported by cast-in-drilled-hole (CIDH) pile foundation. Construction of the superstructure would require temporary beams to support the concrete slab. The Foothill Boulevard bridge would have an 84-foot curb-to-curb roadway width that matches both existing approach widths. There would be a bike lane in both directions of travel. A concrete barrier with picket railing would be placed on both sides of the bridge. The project also includes approximately 750 feet of sidewalk with curb and gutter reconstruction extending from both the east and west bridge approach ends, as well as ADA-compliant driveway reconstruction at the Equestrian Center and flood control channel access roads. An underground gas line on the bridge would be relocated during construction. A fire hydrant, 12-inch waterline, and service connection to the Equestrian Center would be relocated during the project. The project would also include widening of the driveway to Flood Control properties on the north and south sides, as well as possible driveway access to Starberry Farms.

Contact Information

Name
Marco Espinoza
Agency Name
City of San Dimas
Contact Types
Lead/Public Agency

Location

Cities
San Dimas
Counties
Los Angeles
Cross Streets
Foothill Boulevard/North Walnut Avenue
Zip
91773
Total Acres
.5
Parcel #
8661-014-902 and 8665-008-904
State Highways
Hwy 210
Railways
No
Airports
No
Schools
No
Waterways
San Dimas Wash
Township
1N
Range
9W
Section
35

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
Air Resources Board, Transportation Projects, California Department of Fish and Wildlife, South Coast Region 5 (CDFW), California Department of Parks and Recreation, California Department of State Parks, Division of Boating and Waterways, California Highway Patrol, California Regional Water Quality Control Board, Los Angeles Region 4 (RWQCB), California State Lands Commission (SLC), Department of Water Resources, Office of Historic Preservation, Resources Agency, California Native American Heritage Commission (NAHC), California Department of Transportation, District 7 (DOT)
State Reviewing Agency Comments
California Native American Heritage Commission (NAHC), California Department of Transportation, District 7 (DOT)
Development Types
Transportation:Other (Bridge widening)
Local Actions
Site Plan
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Septic System, Sewer Capacity, Solid Waste, Transportation, Vegetation, Wetland/Riparian

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print