North Atwater Non-Motorized Bridge (Lake or Streambed Alteration Agreement No. 1600-2017-0123-R5)

3 Documents in Project

Summary

SCH Number
2012111091
Lead Agency
Los Angeles, City of (City of Los Angeles)
Document Title
North Atwater Non-Motorized Bridge (Lake or Streambed Alteration Agreement No. 1600-2017-0123-R5)
Document Type
NOD - Notice of Determination
Received

Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2017-0123-R5, pursuant to section 1602 of the Fish and Game Code to the project Applicant, City of LA, Bureau of Engineering. The project is limited to the construction of a steel bridge that would span the approx. 325 foot width of the LA River channel and include one major pier supported via new concrete footings below the channel bottom. A water diversion would divert water around the site, including the work platform that would be created over the River bottom to keep vehicles and workers out of the sandy bottom surface. A construction crane would be used to install the structural steel frame and mast. Project construction would generally consist of five phases: mobilization, site preparation, site work, steel fabrication, and architectural finishing.

Contact Information
Brock Warmuth
CDFW
3883 Ruffin Road
San Diego, CA 92123

858-467-4201

Location

Coordinates
34°7'51.57"N 118°16'24.42"W
Cities
Los Angeles, City of Los Angeles
Counties
Los Angeles
Cross Streets
Los Angeles River and Rigali Avenue
Zip
90039
Total Acres
1
Parcel #
5594018900, 5593002907
State Highways
I-5, SR 134, Hwy 2
Railways
UPRR
Waterways
Los Angeles River
Township
1N
Range
13W
Base
SBB&M

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
3883 Ruffin Road, San Diego, CA 92123

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search