2012 PM2.5 Plan

3 Documents in Project

Summary

SCH Number
2012111045
Lead Agency
San Joaquin Valley Air Pollution Control District
Document Title
2012 PM2.5 Plan
Document Type
NOD - Notice of Determination
Received
Posted
12/26/2012
Document Description
The 2012 PM2.5 Plan presents the San Joaquin Valley Air Pollution Control District's (District) strategy for achieving National Ambient Air Quality Standards (NAAQS) for particulate matter with a diameter of 2.5 microns or less (PM2.5), as established by the United States Environmental Protection Agency (EPA) in 2006. After approval by the California Air Resources Board (ARB), the Plan will be submitted to EPA for review. Following receipt of the Plan, EPA must determine Plan completeness within six months. As required by the federal Clean Air Act (CAA) Section 100k, the EPA must act on the Plan within one year of finding the Plan complete. EPA approval of the Plan places it in the State Implementation Plan (SIP) as required by the federal Clean Air Act (CAA) and the EPA;s Clean Air Fine Particle Implementation Rule, Final Rule (72 FR 20586-20667). In addition to meeting the requirements of the CAA and containing measures needed to attain the NAAQS as expeditiously as practicable, the SIP includes the latest technical information, including emissions inventory, monitoring data, and computer modeling results. The Plan is divided into several chapters, with supporting documents provided as appendices. The District developed the Plan with an extensive public process, including workshops and draft documents provided by the District in April, June, and October of 2012.

Contact Information

Name
Mark Montelongo
Agency Name
San Joaquin Valley Air Pollution Control District
Contact Types
Lead/Public Agency

Location

Counties
San Joaquin

Notice of Determination

Approving Agency
San Joaquin Valley Unified Air Pollution Control District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print