Mater Dei High School Parking Structure and School Expansion Project

3 Documents in Project

Summary

SCH Number
2012111043
Lead Agency
City of Santa Ana
Document Title
Mater Dei High School Parking Structure and School Expansion Project
Document Type
NOD - Notice of Determination
Received
Posted
3/17/2016
Present Land Use
The City of Santa Ana General Plan designation for the project site is Institutional (INS) and Low Density Residential (LR7). The City of Santa Ana Zoning Ordinance designation for the site is Open Space (O) and Single Family Residence (R1).
Document Description
The proposed project involves the construction of a three-level parking structure east of the school's existing campus (east of the existing football and soccer fields) and a two-story classroom building within the boundaries of the existing campus (west and south of classroom buildings 100 and 600). No change to the school's existing operations would occur; however, maximum student enrollment is proposed to be increased from 2,200 students to 2,500 students. The addition of the proposed parking structure would increase the size of the campus from ~21 acres to 25 acres.

Contact Information

Name
Vince Fregoso
Agency Name
City of Santa Ana
Contact Types
Lead/Public Agency

Location

Cities
Santa Ana
Counties
Orange
Cross Streets
Edinger Avenue and Bristol Street
Zip
92707
Total Acres
25
Parcel #
Numerous
State Highways
SR-55
Railways
Yes
Schools
Yes
Waterways
Santa Ana River
Township
6S
Range
10W
Section
22
Base
SBB&M
Other Information
1202 West Edinger Avenue

Notice of Determination

Approving Agency
City of Santa Ana
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print