Barranca Channel Repair Project (Lake or Streambed Alteration Agreement No. EPIMS-ORA-25756- R5)

13 Documents in Project

Summary

SCH Number
2012111011
Lead Agency
Orange County
Document Title
Barranca Channel Repair Project (Lake or Streambed Alteration Agreement No. EPIMS-ORA-25756- R5)
Document Type
NOD - Notice of Determination
Received
Posted
5/15/2023
Document Description
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement (EPIMS-ORA-25756-R5), pursuant to Fish and Game Code section 1602, the project Applicant, Orange County Department of Public Works. The project is limited to the replacement of earthen banks with ungrouted riprap in 1,790 linear feet of Barranca Channel. Currently, the project site has an earthen invert, earthen channel banks, and sparse existing riprap; the existing riprap has been installed where the banks are sloughing down into the invert. The channel currently has urban runoff which will be pumped around the construction site via cofferdams and sump pumps. Project activities will be executed from, and the staging areas will be placed on, the existing County -owned maintenance road adjacent to and outside of the channel. Construction is anticipated to take approximately four months.

Contact Information

Name
Jennifer Blackhall
Agency Name
CDFW
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Location

Cities
Irvine
Counties
Orange
Regions
Southern California
Cross Streets
See below "Other Location Info."
Other Location Info
The project is located between Barranca Parkway and Jamboree Road, at Barranca Channel, a tributary to San Diego Creek, in the City of Irvine, County of Orange, State of California; Latitude 33.694057, Longitude -117.834652.

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Orange
Final Environmental Document Available at
The Mitigated Negative Declaration prepared for the project is available to the general public at the office location listed above for the Lead Agency. CDFW’s record of project approval as a Responsible Agency is available at CDFW’s regional office.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print