San Diego Creek (Facility F05) d/s Irvine Center Drive (Lake or Streambed Alteration Agreement No. 1600-2017-0162-R5)
13 Documents in Project
Summary
SCH Number
2012111011
Lead Agency
Orange County
Document Title
San Diego Creek (Facility F05) d/s Irvine Center Drive (Lake or Streambed Alteration Agreement No. 1600-2017-0162-R5)
Document Type
NOD - Notice of Determination
Received
Posted
12/4/2017
Present Land Use
County Flood Control/Transportation Use
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2017-0162-R5, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Orange County Public Works.
Project is limited to stream impacts associated with the San Diego Creek (Facility F05) d/s Irvine Center Drive project. The project was previously permitted as a part of Streambed Alteration Agreement No. 1600-2009-0050-R5. Sediment and vegetation will be removed from a 600-foot long by 40 foot wide section of channel with existing concrete banks and articulating concrete mat channel invert. Sediment and vegetation will also be removed from two existing 10-foot wide concrete grade stabilizing structures. Trimming of overhanging vegetation will also occur where vegetation impedes access on the existing access roads on both sides of the 600-foot long by 40-foot wide channel as well as the two 10-foot wide concrete grade stabilizing structures. Impacts are limited to 0.92 acres.
Contact Information
Name
Kevin Hupf
Agency Name
California Department of Fish and Wildlife
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Irvine
Counties
Orange
Regions
Countywide
State Highways
Multiple
Railways
Multiple
Airports
Multiple
Schools
Multiple
Waterways
Multiple
Township
5S
Range
9W
Base
SBB&M
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No