County-Wide Long-Term Routine Maintenance Permitting Program (Lake or Streambed Alteration Agreement No. 1600-2013-0019-R5)

13 Documents in Project

Summary

SCH Number
2012111011
Lead Agency
Orange County
Document Title
County-Wide Long-Term Routine Maintenance Permitting Program (Lake or Streambed Alteration Agreement No. 1600-2013-0019-R5)
Document Type
NOD - Notice of Determination
Received
Posted
4/13/2016
Present Land Use
County Flood Control/Transportation Use
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2013-0019-R5, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Orange County Public Works. Project is limited to routine maintenance activities within multiple streams, beneath existing bridges crossing over streams, and within constructed flood control basins located throughout Orange County. Maintenance activities would include channel and basin/dam maintenance (i.e., cleaning, silt removal, slope maintenance/repair), landscape maintenance and vegetation control/removal, insect/rodent control, rip-rap repair, structural inspection/cleaning, removal/replacement of concrete lining, and the repair and backfill of washouts. Bridge maintenance activities would include maintenance of stream bed, bank and channel in the immediate vicinity of the bridge, and repair of concrete bridge elements within the channel.

Contact Information

Name
Kevin Hupf
Agency Name
California Department of Fish and Wildlife
Contact Types
Lead/Public Agency

Location

Cities
Santa Ana
Counties
Orange
Regions
Countywide
State Highways
Multiple
Railways
Multiple
Airports
Multiple
Schools
Multiple
Waterways
Multiple
Township
5S
Range
9W
Base
SBB&M

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print