Streambed Alteration Agreement 1600-0131-R2 Bucklen Rip Rap and Natural Rock Staircase

Summary

SCH Number
2012108273
Lead Agency
Fish & Game #2
Document Title
Streambed Alteration Agreement 1600-0131-R2 Bucklen Rip Rap and Natural Rock Staircase
Document Type
NOE - Notice of Exemption
Received
Posted
10/18/2012

Document Description
The project is limited to the installation of bank stabilzation (approximately 621-feet long x 8-foot tall using native boulders), to prevent future seasonal shoreline erosion. Native boulders shall be placed across the rip rap to create a natural rock staircase to allow for safe beach access. A 4000# Excavator shall be used to place the boulders. Access for the excavator will be along the dry lake shore after water levels have receded. No native vegetation shall be removed as part of the project, and the project shell be installed during seasonal recession of water. Work shall not be undertaken during inclement weather, periods of precipitation or forecase precipitation, and hay bales will be used if rain is anticipated. No excavation shall occur within the water of Lake Almanor.

Contact Information
Julie Newman
California Department of Fish and Game
North Central Region 1701 Nimbus Road, Suite A
Sacramento, CA 95670

Phone : (530) 283-6866

Location

Counties
Plumas

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
S:15303
Reasons for Exemption
Reconstruction or replacement.
Download CSV New Search