SF State Romberg Tiburon Center (RTC) Solar Photovoltaic Project

2 Documents in Project

Summary

SCH Number
2012102059
Lead Agency
California State University Board of Trustees
Document Title
SF State Romberg Tiburon Center (RTC) Solar Photovoltaic Project
Document Type
NOD - Notice of Determination
Received
Posted
1/25/2013
Present Land Use
SF3 (residential-unit every 1-5 acres) and Residential, Single-family Planned Bayfront Conservation Zone (BFC-RSP-1)
Document Description
RTC proposes to construct four new carport structures with roofs that consist of fixed solar PV panels within the southern portion of the lower surface parking area and then connect this new infrastructure via underground conduits to an inverter/frequency converter on the northern side of Building 36, a research and education building that would receive the incoming solar-generated power. The carport solar structures would require a supporting post about every 20 feet for a total of 10 posts. Holes would need to be drilled through the existing paved parking area and would extend into the soil about 12.5 feet below grade. The posts would be placed directly into the paved parking areas nearby and around, but not in, the leach fields. All systems would adhere to CA Building Codes/Standards and CA Energy Commission technical and installation specifications.

Contact Information

Name
Wendy Bloom
Agency Name
California State University Board of Trustees
Contact Types
Lead/Public Agency

Location

Cities
Tiburon
Counties
Marin
Cross Streets
3150 Paradise Drive; Teaberry Lane is the nearest cross street intersection
Zip
94920
Total Acres
36
Parcel #
058-100-69
State Highways
SR 131
Schools
3
Waterways
San Francisco Bay

Notice of Determination

Approving Agency
San Francisco State University
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print