The Athenian School Faculty Housing

2 Documents in Project

Summary

SCH Number
2012102043
Lead Agency
California Department of Conservation (DOC)
Document Title
The Athenian School Faculty Housing
Document Type
NOD - Notice of Determination
Received
Posted
12/26/2012
Present Land Use
General Agricultural Zoning District, A-2/General Plan Land Use Designation of Public and Semi-Public (PS) and Open Space (OS)
Document Description
The Athenian School (Applicant and Owner), County File #LP12-2024: The applicant requests approval to amend county File #LP 335-63 to establish five (5) residential units for faculty housing, each approximately 1,200 square feet in size and 15 feet tall. The project also involves the removal of seventeen (17) trees ranging in size from 7 inches to 20 inches in diameter, and work within the drip line of seven (7) trees. On-site parking is located in various areas of property provided for these units. The applicant is also requesting a variance for a 20-year front yard setback (where 25 feet is required) to allow the porch feature on the proposed residences. The subject property is located at 2100 Mount Diablo Scenic Boulevard in the unincorporated area of Danville. (Zoning: A-2, General Agricultural Zoning District) (General Plan: Public and Semi-Public, PS and Open Space, OS) (Assessor's Parcel Number: 203-150-002)

Contact Information

Name
Jennifer Cruz
Agency Name
Contra Costa County
Contact Types
Lead/Public Agency

Location

Cities
Danville
Counties
Contra Costa
Cross Streets
Mount Diablo Scenic Boulevard and Blackhawk Road
Zip
94563
Total Acres
73
Parcel #
203-150-002
State Highways
No
Railways
No
Airports
No
Waterways
No
Township
1S
Range
1W
Section
23

Notice of Determination

Approving Agency
Contra Costa County
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.