Long-term Contract for the Exchange of Water Between Bureau of Reclamation and BBID and Wholesale Water

2 Documents in Project

Summary

SCH Number
2012102008
Lead Agency
Byron Bethany Irrigation District
Document Title
Long-term Contract for the Exchange of Water Between Bureau of Reclamation and BBID and Wholesale Water
Document Type
NOD - Notice of Determination
Received
Posted
11/28/2012
Present Land Use
Agricultural

Document Description
The Project includes the construction and operation of facilities to allow for the delivery of water supplies to accommodate the anticipated demand of Tracy Hills. BBID would introduce up the 4,500 acre-feet per year of its non-CVP water at the Delta-Mendota Canal between March and October. Introduced water would be exchanged with Reclamation at point of introduction. The CVP water would be treated at the City of Tracy's treatment plant for delivery by the City of Tracy to Tracy Hills.

Contact Information
Rick Gilmore
Byron Bethany Irrigation District
7995 Bruns Road
Byron, CA 94514

Phone : (925) 634-3534

Location

Coordinates
37°47'10.3"N 121°35'29.8"W
Counties
Alameda San Joaquin
Cross Streets
Kelso Road and Bruns Road
Zip
94514
Total Acres
5.9
Parcel #
099B-7050-001-05
Waterways
BBID Canal 70, USBR Delta Mendota Canal
Township
2S
Range
3E
Section
1
Base
MDB&M
Other Location Info
Byron

Notice of Determination

Approving Agency
Byron Bethany Irrigation District
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
Byron Bethany Irrigation District, 7995 Bruns Road, Byron, CA 94514.

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.