Camp Vernon Kilpatrick Replacement Project
2 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2012102002
- Lead Agency
- Los Angeles County
- Document Title
- Camp Vernon Kilpatrick Replacement Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 12/3/2013
- Present Land Use
- Camp Kilpatrick is an existing County Juvenile residential treatment facility / P (public and Semi-public Facilities)
- Document Description
- The existing Camp Kilpatrick accommodates up to 125 detainee occupants and is comprised of 44,878 square feet (sf) of buildings; 86,325 sf of outdoor facilities, surface parking (39 spaces); and hardscape and landscape. The County is proposing to demolish all existing structures and outdoor facilities at Camp Kilpatrick (with the exception of the swimming pool and kitchen/dining hall) and construct a replacement camp that would accommodate up to 120 detainee occupants and have approximately 47,000 sf of new buildings; 65,095 sf of outdoor facilities, surface parking (up to 180 spaces); and hardscape and landscape. The proposed structures and related facilities would be located generally in the same footprint as the existing Camp Kilpatrick facilities. The dining hall would repurpose through interior remodeling to manage food carts for the camp.
- Contact Information
-
Vincent Yu
Los Angeles County
Lead/Public Agency
900 S. Fremont, PMD ll, 5th Floor
Alhambra, CA 91803
Phone : (626) 300-3203
Location
- Coordinates
- 34°05'35"N 118°50'16"W
- Cities
- Malibu
- Counties
- Los Angeles
- Cross Streets
- 427 Encinal Canyon Road, Malibu, CA
- Zip
- 90265
- Total Acres
- 11.7
- Parcel #
- 4471-003-900
- State Highways
- SR 23
- Railways
- N/A
- Airports
- N/A
- Schools
- N/A
- Waterways
- N/A
Notice of Determination
- Approving Agency
- County of Los Angeles
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- Los Angeles County Dept. of Public Works 900 S. Fremont Ave., PMD II, 5th Floor Alhambra, CA 91803
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.