Tenth Avenue Marine Terminal Shore Power Project
3 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2012101072
- Lead Agency
- San Diego Unified Port District
- Document Title
- Tenth Avenue Marine Terminal Shore Power Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 7/23/2018
- Present Land Use
- Marine Terminal, Marine Related Industrial, Terminal Berthing
- Document Description
- Project involves the installation and operation of shore power equipment and its necessary infrastructure at the Tenth Avenue Marine Terminal. The project allows cargo ships to use electrical power from shore power rather than the vessels' auxiliary engines. A portion of the TAMT Shore Power System was constructed in 2013, which included two shore power outlets at berth 10-2 and 10-3, as well as the installation of an underground duct bank to berth 10-4 to allow for future expansion. The proposed project extends shore power capabilities to berth 10-4, as originally contemplated and previously authorized by TAMT Shore Power Project.
- Contact Information
-
Larry Hofreiter
San Diego Unified Port District
Lead/Public Agency
3165 Pacific Highway
San Diego, CA 92101
Phone : (619) 686-6257
Location
- Coordinates
- 32°42'3.42"N 117°9'38.9"W
- Cities
- San Diego
- Counties
- San Diego
- Cross Streets
- Harbor Drive & Beardsley
- Zip
- 92101
- Total Acres
- .2
- Parcel #
- 020-183; 020-012; 020-111
- State Highways
- I-5
- Railways
- BNSF
- Schools
- Perkins, Cesar Chavez
- Waterways
- San Diego Bay
Notice of Determination
- Approving Agency
- San Diego Unified Port District
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- 3165 Pacific Highway, San Diego, CA 92101
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.