Venoco Platform Holly Power Cable Replacement Project

3 Documents in Project

Summary

SCH Number
2012101024
Lead Agency
California State Lands Commission
Document Title
Venoco Platform Holly Power Cable Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
2/1/2013
Present Land Use
Recreation; Non-conforming land use (City of Goleta)
Document Description
The project consists of the replacement of an existing 46-year-old, 16.5 (kV) power cable between the Ellwood Onshore Facility in the City of Goleta and Platform Holly in the Pacific Ocean as part of repair and maintenance. The project includes installation of a 15,700 ft long replacement power cable from the EOF to Platform Holly, of which 800 ft is in the City. The new cable will be installed at an entry pit of the EOF in the gravel access road, and continues south under a portion of Sanpiper under the beach and surf zone to an exit pit 1,400 feet offshore.

Contact Information

Name
Sara Iza
Agency Name
City of Goleta
Contact Types
Lead/Public Agency

Location

Cities
Goleta
Counties
Santa Barbara
Cross Streets
Offshore in State waters of Pacific Ocean and at 7979 Hollister Avenue, Goleta
Zip
93117
Parcel #
079210042
State Highways
Hwy 101
Railways
UPRR
Schools
Ellwood ES
Waterways
Pacific Ocean

Notice of Determination

Approving Agency
City fo Goleta
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print